Laserfiche WebLink
Jul 07 08 11:47a p.3 <br />I 1. 0 0 <br />a. -CU -Test Az#euo <br />Environmental Testing Service <br />Vapor - Secondary - Moniors - Repairs 5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />0 Piping Manufacturer <br />0 Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />®Pressure <br />0 Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: .1-ci <br />il :!:`RMi�j1511!`, <br />Piping Run #1 Piping Run # Piping Run # Piping Run # <br />Piping Material: <br />FFP <br />Piping Manufacturer. <br />SMITH <br />Piping Diameter: <br />3 over 2 <br />Length of Piping Run: <br />35' <br />Product Stored: <br />Gasoline <br />Method and location of <br />piping -run isolation: <br />Test Boot <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Min. <br />startingtest: <br />Test Start rurne: <br />10.30 Am <br />Initial Reading (R[): <br />Fail <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RD: <br />Pass/Fail Threshold or <br />Criteria: <br />psi <br />Test Resul <br />0 Pass 19 Fail 0 Pass <br />a Fail 0 Pass 0 Fail 0 Pass 0 Fail <br />COMMellft — (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />No Air Bubbles Were Seen On Eather End Of Pine Run.. Look Under UDC InThe <br />Flex Pipe <br />