My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul 07 08 11:47a p.3 <br />I 1. 0 0 <br />a. -CU -Test Az#euo <br />Environmental Testing Service <br />Vapor - Secondary - Moniors - Repairs 5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />0 Piping Manufacturer <br />0 Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />®Pressure <br />0 Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: .1-ci <br />il :!:`RMi�j1511!`, <br />Piping Run #1 Piping Run # Piping Run # Piping Run # <br />Piping Material: <br />FFP <br />Piping Manufacturer. <br />SMITH <br />Piping Diameter: <br />3 over 2 <br />Length of Piping Run: <br />35' <br />Product Stored: <br />Gasoline <br />Method and location of <br />piping -run isolation: <br />Test Boot <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Min. <br />startingtest: <br />Test Start rurne: <br />10.30 Am <br />Initial Reading (R[): <br />Fail <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RD: <br />Pass/Fail Threshold or <br />Criteria: <br />psi <br />Test Resul <br />0 Pass 19 Fail 0 Pass <br />a Fail 0 Pass 0 Fail 0 Pass 0 Fail <br />COMMellft — (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />No Air Bubbles Were Seen On Eather End Of Pine Run.. Look Under UDC InThe <br />Flex Pipe <br />
The URL can be used to link to this page
Your browser does not support the video tag.