Laserfiche WebLink
Jul 07 08 11:47a p.4 <br />w " <br />O. -CU -Test ie Co -� <br />Environmental Testing Service 1 <br />Vapor • Secondary • Moni:ors • Repairs 6. PEPING SUW TESTING <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />❑ Industry Standard IN Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />0 Pressure <br />❑ Vacuum ®Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: VMI Barrett Sump Tester <br />Equipment Resolution; -5 nn+h <br />s <br />�i <br />Sump #1 <br />Sump # Sump # Sump # <br />Sump Diameter: <br />36" <br />Sump Depth: <br />30" <br />Sump Material: <br />FRP <br />Height from Tank Top to Top of <br />Hi est Piping Penetration: <br />16" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />4" <br />Condition of sump prior to testing: <br />Good <br />Portion of Sump Tested' <br />All <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />0 Yes ❑ No <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes 0 No ❑ NA <br />product and water)?" <br />NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?' <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No [INA <br />❑ Yes 0 No 0 NA <br />Was fail-safe verified to be <br />❑ Yes ❑ No 19 <br />operational?' <br />NA <br />❑ Yes 0 No ❑ NA ❑ Yes ❑ No ❑ NA <br />0 Yes ❑ No ❑ NA <br />Wait time between applying <br />j <br />pressure/vacuum/water and starting <br />15 Min. ! <br />test: <br />Test Start Time: <br />10:30 Am <br />Initial Reading (Ri): <br />600 ml <br />Test End Time: <br />11:00AM <br />Final Reading (RF): <br />600ml <br />Test Duration: <br />30 Min <br />Change in Reading (RE,R,): <br />0.0 <br />Pass/Fail Threshold or Criteria: <br />.05 gph <br />Test Result: <br />13 Pass ❑ Fail <br />❑ Pass 0 Fail ❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />®Yes ❑ No DNA <br />❑ Yes ❑ No ❑ NA O Yes O No ❑ NA <br />❑ Yes 0 No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />®Yes ❑ No ❑ NA <br />❑ Yes ❑ No DNA ❑ Yes O No ❑ NA <br />❑ Yes O No ❑ NA <br />CO ents —(include information on r�airs made prior to testing, and recommended follow-up for failed tests) <br />i If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk ( r KGs" teg&d9�§ ogq; 333-1083 • Cell: (530) 392-0610 <br />