Laserfiche WebLink
Jul 07 08 11:47a p.5 <br />Environmental Testing Service <br />Vapor • secondary • Monitors • Mai ER -DISPENSER CONT ANT (UDQ TESTING <br />Test Method Developed By. ❑ UDC Manufacturer O Industry Standard ® Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure O Vacuum ®Hydrostatic <br />❑ Other (Spec) <br />Test Fgtdpment TTcp,4- VAAT T2arrrtF Qrem» T^cte FnninT" T?eseleLit; n- A,; (tni+ <br />1 h r --t, .t.....-- .. .. 1". T <br />Comments —(include information on repairs made prior to testing; and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />5440 Henness Gap Rd., Garden Valley, CA 95633 - Phone: (530) 333-1063 - Cell: (530) 392-0610 <br />UDC # <br />UDC # UDC # <br />UDC # <br />UDC Manufacturer: <br />Bravo <br />UDC Material: <br />FRP <br />UDC Depth: <br />1231 <br />Height from. UDC Bottom to Top <br />Bottom <br />-ofHighest Piping Penetration: <br />Height from UDC Bottom to <br />Bottom <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Good <br />testis <br />Portion of UDC Tested <br />All <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes D No <br />IN <br />D Yes ❑ No DNA ❑ Yes D No DNA <br />a Yes ❑ No ❑ NA <br />product and water)?' <br />NA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?` <br />D Yes ❑ No <br />®NA O Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No DNA <br />Was fail-safe verified to be <br />operational?* <br />D Yes ❑ No <br />®NA ❑ Yes ❑ No O NA O Yes ❑ No ❑ NA <br />D Yes O No ❑ NA <br />Wait time between applying <br />15 Min. <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: <br />11:00 Am <br />Initial Reading (R1): <br />550ml <br />Test End Time: <br />11:30 Am <br />Final Reading (RF): <br />550 ml <br />Test Duration: <br />30 Min. <br />Change in Readin (RF -RT): <br />0.0 <br />Pass/Fail Threshold or Criteria: <br />.05 gph <br />Test Result <br />IN Pass ❑ Fail O Pass ❑ Fail D Pass ❑ Fail <br />O Pass O Fail <br />Was sensor removed for testing? <br />QYes ❑ No <br />❑ NA ❑ Yes ❑ No ❑ NA D Yes O No ❑ NA <br />D Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑ No <br />DNA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes D No ❑ NA <br />Comments —(include information on repairs made prior to testing; and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />5440 Henness Gap Rd., Garden Valley, CA 95633 - Phone: (530) 333-1063 - Cell: (530) 392-0610 <br />