My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q1FNIFIED PROGRAM CONSOLIDATED FOR1W <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54490-546 <br /> 1.CONTINUOUS ELECTRONIC MONITORING []2.FLOAT AND CHAIN ASSEMBLY [:1 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS E399.OTHER(Specify): ----------------------------------------------------- ------------------------------------------------------------------ 490-56, <br /> PANEL MANUFACTURER:Veeder Root MODEL#:TLS-350 <br /> 490-58 <br /> LEAK SENSOR MANUFACTURERNeeder Root MODEL#(S):001 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES r_1 b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES M b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES [I b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. 0 a.YES El b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS O L SINGLE-WALLED [:12.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: El 1.LIQUID El 2.PRESSURE [13.VACUUM <br /> ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS El a.YES 0 b.No 490.64b <br /> Vii.'PERIODIC SYSTEM TESTING <br /> F1 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> ----------LEAK-DETECTION ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1)_____....... <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> 3.SPILL BUCKET9_��1k9_;Ff§_fK5_X7 ----------------------------------------------------------------------------------------------------------------------------------------------4-9-0--6--7-, <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> 0 Alarm logs 490-68a 0 Visual Inspection Records 490-68b F1 Tank integrity testing results 490-68. <br /> [:]SIR testing results(and supporting documentation records). 490-68d 0 Tank gauging results(and supporting documentation records). 490-68c <br /> ATG Testing results(and supporting documentation records).490-68f E] Corrosion Protection 60-day logs 490-68g <br /> Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> 10 Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> [D THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> > The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> > Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> Overfill prevention=Drop tube with mechanical flapper set at 95% <br /> Note:Designated Underground Storage Tank Operator(DUSTO)inspections occuring monthly and include tripping/alarming <br /> monitoring system.In order to preserve alarm history the Designated Operator will print out alarm history/log prior to completing <br /> monthly inspection and will affix to monthly DUSTO. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Kasi Montgomery/Jason Schoon 490-72 TITLE Plant Engineering Supervisor/District Environ.Coord <br /> 490-73 <br /> NAME Troy Hanson 490-74 TITLE Center Manager <br /> 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> UPCF UST-D(12/2007)3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.