Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-jPage 1 of 2) J U L 1 9 Z U 1 U <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. . pti/�f+ 49°2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) PERM��wfl V C <br /> ES <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ 1 <br /> BUSINESS NAME(Same as FACILITY NAME)UPS-Stockton 3. <br /> BUSINESS SITE ADDRESS 1532 N.Broadway 103 CITY Stockton 104 <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR§2632,2634,2638,2641) <br /> --------------------------634,--638,------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHERS eci 490-3a <br /> Q ( p �')� 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ED 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> PANEL MANUFACTURER: Veeder Root 490-7. ; MODEL#: TLS-350 0847090-002 490-8 <br /> --------------- -------------------------------------------------------------- - ---------------------------------------------------------------- <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. ! MODEL#(S): 302 490-10 <br /> ® 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: Veeder Root 490-12. MODEL#: TLS-350 0847090-022 490-13 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: Veeder Root 490.14. MODEL#(S): 490-15 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ® c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ® b.0.2 h. ❑ c.OTHER490-18 <br /> g•P• g•P• (Specify)- a90-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> E] 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS E] b.60 HOURS 490-21 <br /> 490-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FRE UENCY: ❑ a.ANNUALLY Elb.BIENNIALLY F1 c.OTHERS eci fy)' 490-24 <br /> Q ( p ` 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: ®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> --------------------------------------------------------- <br /> MANUFACTURER:Veeder Root 490-30 ! MODEL#: TLS-350 490-31 <br /> LEAK SENSOR MANUFACTURER: Veeder Root MODEL#(S): 208 <br /> 490-32 490-33 <br /> -------------------------------'--------'-------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> ________ PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 2636) 490-36 <br /> - ------------------ ---------------------- <br /> MLLD MANUFACTURER(S):VWI 49°-37 MODEL#(S): VMI 99LD-2000 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> -------------------------------------------------------------------------------------------------------------------------------------------90------------------------------------------------------------------------------490-Tf- <br /> ELLD MANUFACTURER(S) ago-ao. ! MODEL#(S): ago-a1 <br /> ------------------------------ -------------------------------------------------------------------------------- ----------------------------------------------------- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> ® 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ® b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46 490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> *Allowed for monitoring of unburied emergency enerator fuel 2iping only per HSC 25281.5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> El99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 <br /> i <br />