Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foilowing checklist: <br /> M Yes U No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> U Yes 1@ N/A Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes U No* Was accuracy of system product level readings tested? <br /> Yes U No* Was accuracy of system water level readings tested? <br /> M <br /> F U Yes N/A Were all probes reinstalled properly? <br /> YesL), No* Were all items on the equipment manufacturer's comp <br /> facturer' maintenance checklist completed? <br /> I, I <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): U Check this box if LLDs are not installed. <br /> Complete the fol ing checklist: <br /> Yes For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> (Check all that apply) Simulated leak rate: 0 3 g.p.h.; Ll 0.1 g.p.h; L)0.2 g.p.h. <br /> Yes Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes Was the testing apparatus properly calibrated? <br /> Yes For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> or disconnected? <br /> N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> I or fails a test? <br /> N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be correcte& <br /> IL Comments: <br /> Page 3 of 5 <br />