My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. PIEPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ®Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:VMI Barrett Sump Tester Equipment Resolution: .05 gph <br /> , <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: i <br /> -Sump Depth: ' <br /> -SumpMaterial: <br /> Height from Tank Top to Top of <br /> ®a <br /> Highest Piping Penetration: <br /> Height from Tank Tap to Lowest r, <br /> -Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both AYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?. <br /> Turbine shutdown response time --1� <br /> Is system programmed for fail-safe Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be _9-Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ®No ❑NA <br /> o eratio ?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting ,moi <br /> test: <br /> Test Start Time: <br /> Initial Reading(RE): C t-.. <br /> Test End Time: <br /> Final Reading(RF): -41 as <br /> Test Duration: '1�y <br /> Change in Reading(RF--R$): <br /> Pass/Fail Threshold or Criteria: .5gph <br /> Test Result: IR Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functionalafter testing? <br /> CO m ments—(include inform ation on repairs made prior to testing: and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.