Laserfiche WebLink
7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard ®Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used VMI Barrett Sump Tester Equipment Resolution: .05 gph <br /> UIDC# U # UDC U # <br /> UDC Manufac r <br /> UDC Material: 5 izz- <br /> LTDC <br /> the 12- r r <br /> Height from UDC Bottom to Top <br /> of Hi est Pipjag Penetration: <br /> Height from UDC Bottom to - <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testin : 8,�> <br /> Portion of UDC Tested �- <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No A ❑Yes ❑No DNA ❑Yes ❑No D NA ❑Yes D No ❑NA <br /> product and water)?II <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes D No 0,NA ❑Yes ❑No D NA D Yes ❑No DNA ❑Yes ❑No ❑NA <br /> safe shutdown?` <br /> Was fail-safe verified to be ❑Yes ❑No dWA ❑Yes ❑No ❑NA ❑Yes ❑No DNA ❑Yes ❑No ❑NA <br /> o onal?' <br /> Wait time between applying <br /> pressurelvacuum/water and <br /> starting test <br /> Test Start Time: <br /> 'tial Reading(R�: <br /> Test End Time: <br /> Final Reading(RF): 4 s- <br /> -Test Duration: -,Pj <br /> Change in Reading( ": a <br /> Pass/Fail Threshold or Criteria: .5 h <br /> Jest Result A Pass 0 Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed fort 'ng? es ❑No ❑NA D Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No D NA <br /> ElWas sensor properly replaced and h,Yes ❑No DNA ❑Yes D No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing and recon ended follow-up for failed tests) <br /> c If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or A",the entire UDC must be tested. (See SVtrRCB LG-160) <br />