Laserfiche WebLink
SWRCB, January 2102 page 5 of 9 <br />7. UNDER -DISPENSER M .l y, TESTINGl <br />Test Method Developed i <br />Y N i ° .. <br />[]Industry Standard : dA #sA - A I °. Engineer <br />'3 ! 2 a 17 ° <br />Test Method <br />OPressure <br />[]Vacuum []Hydrostatic <br />00ther <br />074 r=A I <br />MR 81!.: A itl A MR�gqM+Rnl1 1 A l <br />116 <br />rBo:. A i A X A R g. <br />testing;A f <br />1... .11T 1 <br />1 IAA q $: tlAl <br />A ° <br />' A A iRA 1 irs J"i' a; i x <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Uthe testing method does not test the entire depth of the UDC, specify how much of the UDC was tested. Methods not testing the <br />entire UDC should only be used if the monitoring system provides fail-safe shutdown. (See SWRCB LG -160) <br />2 With the submersible pump running, place the sensor in product (discriminating sensors should be placed in water). The time <br />between placing the sensor in product and the turbine shutting is the response time. This should be done if the secondary <br />containment method used does not test the entire volume of the UDC. <br />* This information is not needed if the entire sump is tested. <br />Re . <br />