Laserfiche WebLink
Page 3 of 8 <br />r9 <br />Test Method Developed By: <br />❑ Piping Manufacturer 2 Industry Standard <br />❑ Other (Specify) <br />❑ Professional Engineer <br />Test Method Used: <br />0 Pressure <br />❑ Vacuum <br />❑ Other (Specify) <br />❑ Hydrostatic <br />Test Equipment Used: Pressure Gauge <br />Piping Run #1 <br />rPipingMatedna!l: Flex <br />Piping Run #2 <br />Flex <br />Equipment Resolution: 0-30 psi <br />Piping Run #3 Piping Run # <br />Flex <br />Flex <br />Flex <br />Flex <br />Piping Diameter: <br />3/4" <br />1" <br />11/2i <br />Length of Piping Run: <br />10' <br />10' <br />S' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of piping- <br />run isolation: <br />Test boot <br />Test boot <br />Test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />-starting test: <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />15:00 <br />15:00 <br />15:00 <br />Initial Reading (Rj): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />16:00 <br />16:00 <br />16:00 <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF-Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />