Laserfiche WebLink
Page 4 of 8� <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ® Sump Manufacturer 0 Industry Standard 0 Profewlonal Engineer <br />® Other (Sped ) <br />Test Method Used: D Pressure O Vacuum 0 Hydrostatic <br />O Other (Specify) <br />Test Equipment Used: Lalce Test Equipment Resolution: <br />Sump Trans Sump Vent Sump Sump <br />Sump Diameter 46" 28" x 25" 29" x 20" <br />Sump Depth: 60u�" 30" 301' <br />Sum Material: Fiberglass Fiberglass Fiberglass <br />Height from Tank Top to Top of 14" 710 9" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest 17" 16" 18" <br />Electrical Penetration: <br />Condition of sump prior to testing: Clean Clean Clean <br />Portman of Sump Tested' 2" above product 2"above product 2" above product <br />Does turbine shut down when sump <br />sensor detects liquid (both product and O Yes O No 0 NA O Yes O No 0 NA 0 Yes O No 0 NA O Yes O No O NA <br />water?' <br />Turbine shutdown response time N/A (see comment) N/A N/A <br />Is system programmed for fail-safe 0 Yes O No 0 NA O Yes 0 No 0 NA O Yes O No 0 NA O Yes O No O NA <br />shutdown?' <br />Was fall -safe verified to be O Yes O No 0 NA O Yes O No 0 NA 0 Yes 0 No 0 NA O Yes O No ®NA <br />operallonaI7 <br />Wait time between applying <br />pressuretvacuumfwater and starting 5 min 5 min 5 min <br />test- <br />Test <br />estTest Start Time: 15:00 15:00 15:00 <br />Initial Reading (Ri): 15.01' 15.5" 12.75" <br />Test End Time: 16:00 16:00 16:00 <br />Final Reading (RF); 15.0" 15.5" 12.75" <br />Test Duration: 1 hour 1 hour 1 hour <br />Change in Reading (RF -RI): 0 0 0 <br />Pass/Fad Threshold or Criteria: 1/16" hr 1/16" hr 1/16" hr <br />Test Result: 0 Pass 0 Fail 0 Pass O Fail 0 Pass 0 Fail O Pass O Fail <br />Was sensor removed for testing? 0 Yes O No O NA 0 Yes O No O NA 0 Yes O No O NA O Yes O No O NA <br />Was sensor property replaced after 0 Yes 0 No O NA ® Yes O No O NA 0 Yes O No O NA O Yes O No O NA <br />testim? <br />Co - linc&* information on repairs made p* to testing, and recammerrded follow-up for failed tests) <br />Done during Annual Monitor Certification. <br />' If the entire depth of the sump is not tested, specify how much was tested. if the answer to ay of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />