My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
&=--- <br />�CPage 7 of 8 <br />SPILUOVERFILL CONTAINMENT BOXES <br />Faclli is Not E With Spill/Overfill Containment Boxes ❑ <br />S0I1,10ver611 Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard <br />❑ Other (Specify) <br />❑ Professional Engineer <br />Test Method Used: ❑ Pressure ❑ Vacuum <br />❑ Other (Specify) <br />❑ Hydrostatic <br />Test Equipment Used: Equipment <br />Spill Box # Split Box # Spill Box # Spill Box # <br />Bucket Diameter. <br />Bucket Depth: <br />Wait time between applying <br />pressureNmumlwater and <br />starfina test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading PRF): <br />Test Duration: <br />Change in Ruing "i): <br />Pass/Fail Threshold or Criteria <br />Test Result: ❑ Pass ❑ Fail O Pass ❑ Fail ❑ Pass ❑ Fail <br />® Pass O Fail <br />C,ommerts - (inchade infomration on repairs made gla to tesft and remanded folov-up for failed tests) <br />Done during Annual Monitor Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.