Laserfiche WebLink
&=--- <br />�CPage 7 of 8 <br />SPILUOVERFILL CONTAINMENT BOXES <br />Faclli is Not E With Spill/Overfill Containment Boxes ❑ <br />S0I1,10ver611 Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard <br />❑ Other (Specify) <br />❑ Professional Engineer <br />Test Method Used: ❑ Pressure ❑ Vacuum <br />❑ Other (Specify) <br />❑ Hydrostatic <br />Test Equipment Used: Equipment <br />Spill Box # Split Box # Spill Box # Spill Box # <br />Bucket Diameter. <br />Bucket Depth: <br />Wait time between applying <br />pressureNmumlwater and <br />starfina test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading PRF): <br />Test Duration: <br />Change in Ruing "i): <br />Pass/Fail Threshold or Criteria <br />Test Result: ❑ Pass ❑ Fail O Pass ❑ Fail ❑ Pass ❑ Fail <br />® Pass O Fail <br />C,ommerts - (inchade infomration on repairs made gla to tesft and remanded folov-up for failed tests) <br />Done during Annual Monitor Certification. <br />