Laserfiche WebLink
?—•E'F'' a SAN JOAQUIN COUNTY <br />{ ENVIRONMENTAL HEALTH DEPARTMENT <br />Y. 600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sj�c3ov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />�f <br />W' I � Ys76w <br />Inspection Date: <br />F cility Address: <br />rs /,A 952 <br />Service Request #: <br />Onsite Service Techni <br />an's Name: <br />ICC Service Tec hni an/installer Exp. Date: <br />Manufa turer T inmg: <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />t) <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />P 'Mary piping testing at: <br />Psi <br />_ minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />4 INUNION <br />w <br />co M H ri s Newt <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector. _�� <br />ReceivedB . <br />Title: <br />;-HD 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />