Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: V200091 <br /> Complete the following checklist: <br /> El Yes El No' Is the audible alarm operational? <br /> ❑✓ Yes ❑ No' Is the visual alarm operational? <br /> ✓ Yes No• Were all sensors visually inspected,functionally tested,and confirmed erational? <br /> ❑✓ Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> ✓❑ <br /> Yes <br /> No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> WA <br /> El Yes No' For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ✓ WA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors Initiate positive shut-down? (Check all that apply) <br /> ❑SumprTrench Sensors; ❑Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failureldisconnection? Yes; No. <br /> Q Yes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill prevention <br /> WA valve is installed),is the overfill warning alarm visible and audible at the tank fill points)and operating property? If so,at what percent <br /> of tank capacity does the alarm r? 90 % <br /> El Yes' O No Was any monitoring equipment replaced? If yes, identity specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ❑✓ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)[]Product;❑Water. If <br /> es,describe causes in Section E,below. <br /> ✓ Yes No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,If applicable <br /> ✓ Yes No' Is all monitoring equipment operational permanufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Droptube also equipped with overfill prevention device. <br /> Also tested vent box and transition box sensors, both LS-600, passed and certified. <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/21/07 <br />