My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Remove the hex wrench and re -install the #10-24 <br />inspection port screw with an o -ring seal attached. <br />Torque the screw to 20-25 in. lbs. <br />17. From the end of the drop tube's top flange, <br />illuminate the internal valve flapper with a flashlight <br />and visually inspect the deflector attached to the <br />valve flapper. There should be no visible damage <br />to this deflector. The deflector's shape should be <br />uniform and similar to that of Figure J. If damage <br />is observed, the valve will not operate as designed <br />and must be replaced. <br />Figure J <br />18. After completing these inspection steps, recheck <br />the floats and linkage as detailed in Steps 8 & 9. <br />Using care not to damage the floats or the float <br />guide, reinstall the drop tube assembly into the <br />tank riser. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.