My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I:\apps\JOBS\2006\ 1493\SB989.doc <br />a <br />5. SECONDARY PIPE TESTING <br />Page 3 <br />Test Method Developed By: <br />❑ Piping Manufacturer <br />❑ Other (Spec) <br />X Industry Standard <br />❑ Professional Engineer <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec6) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test E ui ment Used: <br />Piping Material: <br />Run # FOS <br />GeoFlex <br />Run # FOR <br />GeoFlex <br />E ui rn t Resolution: <br />Run # Vent Run # Run # <br />GeoFlex <br />Piping Manufacturer: <br />Environ <br />Environ <br />Environ <br />Piping Diameter: <br />3/4 " <br />1 " <br />1 '/2 " <br />Length of Piping Run: <br />—10, <br />—10, <br />—81 <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of <br />i in -run isolation: <br />Test Bell <br />Test Bell <br />Test Bell <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />+/- 30 Min <br />+/- 30 Min <br />+/- 30 Min <br />Test Start Time: <br />9:00 AM <br />10:00 AM <br />11:00 AM <br />Initial Reading (RI): <br />3 PSI <br />3 PSI <br />3 PSI <br />Test End Time: <br />10:00 AM <br />11:00 AM <br />12:00 PM <br />Final Reading (RF): <br />3 PSI <br />3 PSI <br />3 PSI <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (RF -RI): <br />No Loss <br />No Loss <br />No Loss <br />Pass/Fail Threshold or <br />Criteria: <br />One hour, no loss <br />Comments — (include information on repairs made <br />prior to testing, and recommended follow-up <br />for failed tests) <br />I:\apps\JOBS\2006\ 1493\SB989.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.