My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4100
>
2300 - Underground Storage Tank Program
>
PR0231574
>
COMPLIANCE INFO_1986-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 11:45:21 AM
Creation date
6/23/2020 6:49:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2004
RECORD_ID
PR0231574
PE
2361
FACILITY_ID
FA0002123
FACILITY_NAME
GREWALS GAS & LIQUOR*
STREET_NUMBER
4100
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14333046
CURRENT_STATUS
01
SITE_LOCATION
4100 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231574_4100 E FREMONT_1986-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />F. In -Tank Gauging /SIR FtI111pn1e11t:* ('heck this box if tank gauging is used only for inventory control. <br />U 'heck this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in-tattk gauging equ ptnei t is used to perform leak detection monitoring. <br />Complete the following <br />checklist: <br />O Yes ':; ❑ No* <br />Has all input wiring been inspected for proper ce►try and termination, including testing for ground faults? <br />O Yes ❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />_ <br />O Yes ❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* <br />Was accuracy of system water level readings tested? <br />O Yes ❑ No* <br />Were all probes reinstalled properly? <br />" O Yes O No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section. H, below, describe how and when these deficiencies were or will be corrected. <br />G. Lyne Leak Detectors (LLD): U Check this box if I.l,l)s are not installed. <br />Complete the following checklist: <br />O Yes ❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perf ? <br />O N/A <br />(Check all that apply) Simulated leak rate: U 3 g.p.h.; O 0.1 g.p.h ; O 0.2 g.p.h. <br />❑ Yes ❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes ❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes O -No * <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />O NIA <br />_ <br />O -Yes ❑ No* <br />For electronic LI,Ds, does the turbine automatically shut off if the 1,11) detects a leak? <br />❑ NIA <br />❑ Yes O No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring systemis disabled <br />❑ N/A <br />or disconnected? <br />❑ Yes ❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ NIA <br />malfunctions or fails a test? <br />O Yes ❑ No* <br />For electronic LLDs, have all accessible wiring; connections been visually inspected? <br />O N/A <br />O Yes O No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and vvlren these deficiencies were or will be corrected. <br />H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.