My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_2003-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
6/23/2020 6:50:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2012
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_2003-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # 1 <br />MENNIMMI <br />Piping Run # 2 <br />Piping Run # 3 Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 200' <br />Approx. 200' <br />Approx. 200' <br />Product Stored: <br />Diesel <br />Super 91 <br />Regular 87 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP #1 <br />Test boot at STP #2 <br />Test boot at STP #3 <br />Wait time between applying <br />ressure and starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />9:25 <br />9:05 <br />9:15 <br />Initial Reading (Rj): <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />10:25 <br />10:05 <br />10:15 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.