My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2551
>
2300 - Underground Storage Tank Program
>
PR0231659
>
COMPLIANCE INFO_1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:37:54 PM
Creation date
6/23/2020 6:50:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0231659
PE
2361
FACILITY_ID
FA0003849
FACILITY_NAME
Verizon Business: MANTECA
STREET_NUMBER
2551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19801005
CURRENT_STATUS
01
SITE_LOCATION
2551 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231659_2551 E LOUISE_1985-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equip t: O Check this box if tank g g is used only for inventory control. <br />❑ Check this box if no ank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />S;1 Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes ❑ No* Was accuracy of system product level readings tested? <br />® Yes ❑ No* Was accuracy of system water level readings tested. <br />1111 Yes ❑ No* Were all probes reinstalled properly? <br />)a Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): Q( Check this box if LLDs are not installed. <br />* In the Section H, below, describe how and when mese ueucieuw= wr.— Va naaa <br />Page 3 of 3 <br />03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.