My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2551
>
2300 - Underground Storage Tank Program
>
PR0231659
>
COMPLIANCE INFO_1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:37:54 PM
Creation date
6/23/2020 6:50:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0231659
PE
2361
FACILITY_ID
FA0003849
FACILITY_NAME
Verizon Business: MANTECA
STREET_NUMBER
2551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19801005
CURRENT_STATUS
01
SITE_LOCATION
2551 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231659_2551 E LOUISE_1985-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Eq ment: MCI <br /> ❑X Check this box if tank gauging is used only for inventory control 11/1/2005 <br /> ®Check this box if no tank gauging or SIR equipment is installed. <br /> Complete the following checklist: <br /> ❑x Yes ®No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑x Yes ®No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑x Yes ®No* Was accuracy of system product level reading tested? <br /> EYes ®No* Was accuracy of system water level readings tested? <br /> ❑x Yes ®No* Were all probes reinstalled properly? <br /> x Yes No* Were all items on the 2qui2ment manufacturer's maintenance checklist com leted? <br /> * In the Section H,Below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors (LLD): <br /> Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ®YesNo* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> HN/A all that apply) Simulated Leak rate: _3 g.p.h. 0.1 g.p.h. 0.2 g.p.h. <br /> Yes No Were all LLDs confirmed operational and accurate within regulatory requirement? <br /> Yes No Was the testing apparatus properly calibrated? <br /> Yes No* For Mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> YIN <br /> es No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected: <br /> H.Comments: <br /> Monitoring System Certification <br /> Page 3 of 3 03/01 <br /> MCI-Lodi mon.cert.11-01-05.xis <br />
The URL can be used to link to this page
Your browser does not support the video tag.