Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer <br /> Other(Specify)SWCRB <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:0-5 P.S.I. Equipment Resolution: <br /> Piping#sply&rtn Piping Run# Piping Run# Piping Run# <br /> Piping Material: Polyethylene <br /> Piping Manufacturer: Total containment <br /> Piping Diameter: 3" <br /> Length of Piping Run: 10, <br /> Product Stored: Diesel <br /> Method and location of Term.Boot Term.Boot Term.Boot Term.Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> startin test: <br /> Test Start Time: See comments <br /> Initial Reading(RD: See comments <br /> Test End Time: See comments <br /> Final Reading(RF): See comments <br /> Test Duration: See comments 60 Minutes 60 Minutes 60 Minutes <br /> Change in Reading(RF-RD: See comments 0 0 0 <br /> Pass/Fail Threshold or 5 psi=pass 5 psi=pass 5 psi=pass 5 psi=pass <br /> Criteria: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Bad boot on secondary line visual failure <br />