My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2551
>
2300 - Underground Storage Tank Program
>
PR0231659
>
COMPLIANCE INFO_1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:37:54 PM
Creation date
6/23/2020 6:50:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0231659
PE
2361
FACILITY_ID
FA0003849
FACILITY_NAME
Verizon Business: MANTECA
STREET_NUMBER
2551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19801005
CURRENT_STATUS
01
SITE_LOCATION
2551 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231659_2551 E LOUISE_1985-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br /> Other(Specify)SWCRB <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:Incon Sump Testing Monitor System Equipment Resolution: <br /> Sump#dsl pip Sump# Sump# Sump# <br /> Sump Diameter: 42" <br /> Sump Depth: 28" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 16„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 6„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Clean Clean Clean Clean <br /> Portion of Sump Tested' See comments Bottom Bottom Bottom <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No INA Yes No I NA Yes No I NA Yes No NA <br /> roduct and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe Yes No NA Yes No NA Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes No NA Yes No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 60 Minutes 60 Minutes 60 Minutes 60 Minutes <br /> test: <br /> Test Start Time: See comments <br /> Initial Reading(RI): See comments <br /> Test End Time: See comments <br /> Final Reading(RF): See comments <br /> Test Duration. See comments 15 Minutes 15 Minutes 15 Minutes <br /> Change in Reading(RF-RI): See comments <br /> Pass/Fail Threshold or Criteria: +/-0.002 In. +/-0.002 In. +/-0.002 In. +/-0.002 <br /> A , <br /> *0000 W- <br /> Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA Yes No NA <br /> Was sensor properly replaced and X Yes No X Yes No NA X Yes No NA Yes No NA <br /> verified functional after testing? NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Bad boot on secondary line visual failure <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.