My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:16:35 PM
Creation date
6/23/2020 6:50:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231736_1420 N TRACY_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NAME: <br />piping was changed. Ms. Sorensen did notknow if piping is underground or <br />DBA: <br />Sutter Tracy Community Hospital <br />aboveground. I asked Ms. Sorensen to submit scope of work and cut sheet. <br />Kieth Nichols, Plant Operations Manager <br />06/18/2004 <br />Received fax copy of scope of work and cut sheets. The scope of work is to <br />SCS <br />1420 N. Tracy Blvd., Tracy, CA 95376 <br />upgrade fuel oil piping to boilers during generator replacement. I called Ms. <br />(209) 832-6032 <br />IV. INVESTIGATING OFFICERS (INCLUDING OTHER AGENCIES) <br />Carolyn Sorensen and asked if she know the detail of work. Ms. Sorensen <br />transferred me to Mr. Kieth Nichols. Mr. Nichols stated that the portion of <br />underground piping was rerouted to the new generator. In addition, the existing <br />steel piping was replaced with flex piping. Mr. Nichols also stated that the <br />trench is still opened. I asked Mr. Nichols if there is permit to perform this <br />work? Mr. Nichols did not aware EHD permit is required. I told Mr. Nichols <br />that a permit is required to perform UST piping removal and replacement. An <br />approved permit is required prior to commerce work, and then inspections will <br />follow. Mr. Nichols stated that he will contact contractor AIRCO to get in <br />touch with me for the permit requirements. <br />07/13/2004 <br />I received phone call from Jay Thangaraj from DPR Construction regarding <br />SCS <br />permit application requirement. Mr. Thangaraj stated that he obtained permit <br />application from web site. Mr. Thangaraj stated that the old piping will be <br />replaced with new pipe in different trench. <br />07/15/2004 <br />Filed Financial Responsibility <br />SCS <br />08/11/2004 <br />Received Permit Application SR0039176 from DPR Construction to reroute <br />SCS <br />piping to new backup generator. <br />08/18/2004 <br />Issued deficient letter to DPR Construction. <br />SCS <br />08/25/2004 <br />Received second drawing, but still not satisfy the deficiency letter et. <br />SCS <br />09/02/2004 <br />Talked to Terry Hoshi (402) 399-1296 of HDR regarding deficiency letter. Mr. <br />SCS <br />Hoshi stated that HDR is design company while DPR is construction company. <br />09/07/2004 <br />Received revised drawing, but still shows deficiency/inconsistency of types of <br />SCS <br />piping in the plan. <br />09/09/2004 <br />Received revised drawing and approved the plan to retrofit the piping. See <br />SCS <br />permit approval letter dated on 09/09/2004 <br />09/10/2004 <br />Filed Monitoring and Response Plan. <br />SCS <br />09/15/2004 <br />Witnessed the soil sampling. 2 samples taken from piping trench and 2 samples <br />SCS <br />taken from stockpile. Existing piping had already been removed and disposed <br />to Altamont Landfill (Copy of Non -hazardous waste manifest received on site). <br />09/20/2004 <br />Witnessed the primary piping pressure and soap test. Passed the test and start <br />SCS <br />the lake test. <br />09/21/2004 <br />Witnessed the lake test passed. <br />SCS <br />09/23/2004 <br />Witnessed the secondary piping ressure and soap test passed. <br />09/28/2004 <br />Slope check OK. <br />SCS <br />10/07/2004 <br />Final inspection conducted. This facility is OK to operate. Filed passed line <br />SCS <br />and tank test, stockpile disposal information and as -build. <br />NAME: <br />Sutter Tracy Community Hospital <br />DBA: <br />Sutter Tracy Community Hospital <br />CONTACT PERSON: <br />Kieth Nichols, Plant Operations Manager <br />BUSINESS ADDRESS: <br />1420 N. Tracy Blvd., Tracy, CA 95376 <br />MAILING ADDRESS: <br />1420 N. Tracy Blvd., Tracy, CA 95376 <br />BUSINESS PHONE: <br />(209) 832-6032 <br />IV. INVESTIGATING OFFICERS (INCLUDING OTHER AGENCIES) <br />Name of Investigator(s):� <br />Dina Abate, REHS <br />Kasey Foley, Lead Senior RENS <br />Steven Shih, Senior REHS . <br />1420 N. Tracy Blvd <br />3 of 4 <br />E-mail address <br />dabate@sjcehd.com <br />kfoley@sjcehd.com <br />sshih@sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.