My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:16:35 PM
Creation date
6/23/2020 6:50:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231736_1420 N TRACY_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michelle Streni Le, Senior REHS (209) 468-9847 mle@sjcehd.com <br />Doug Wilson, Supervising REHS (209) 468-3446 dwilson@sjcehd.com <br />Business Address & Phone: <br />San Joaquin County Environmental Health Department <br />304 E. Weber Ave 3rd Floor, Stockton CA 95202 <br />(209) 468-3420 <br />California Code of Regulations (CCR) Section 2637(a) Secondary containment <br />systems installed prior to January 1, 2001 shall be tested by January 1, 2003 and every 36 <br />months thereafter. <br />—> Secondary containment testing was not completed by January 1, 2003. <br />CCR Section 2637(b) All monitoring equipment used to satisfy the requirements of this <br />article shall be installed, calibrated, operated and maintained in accordance with <br />manufacturer's instructions, and certified every 12 months for operability, proper <br />operating condition, and proper calibration. <br />—> Annual monitoring certification was not submitted within twelve months of the <br />last certification two years in a row. <br />VI. ATTACHMENTS <br />1. Letter sent to the facility dated May 23, 2002 <br />2. Inspection report dated July 12, 2002. <br />3. Secondary containment notification letter sent to the facility dated September <br />30, 2002. <br />4. Numerous CUPA newsletters have been mailed to the facility. <br />5. Secondary containment test report date October 15, 2002. <br />6. Letter sent to the facility dated November 06, 2003. <br />7. Inspection reports dated January 22, 2004. <br />8. Certification of return to compliance and hazardous waste emergency <br />information date January 22, 2004. <br />Steven C. Shih, Senior RENS <br />1420 N. Tracy Blvd 4 of 4 <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.