Laserfiche WebLink
X016 <br /> SWRCB,January 2002 SEP Page of <br /> 5. SECONDARY PIPE TESTING ,+ <br /> Test Method Developed By: X Piping Manufacturer C Industry Standard Pr I er <br /> D Other(Spec) <br /> Test Method Used: X Pressure 1 Vacuum ❑Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> li�— 111010M <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Poly Plastic Poly Plastic Poly Plastic Poly Plastic <br /> Piping Manufacturer: Environ Environ Environ Environ <br /> Piping Diameter: 1" P, 1" F, <br /> Length of Piping Run: 12' 12' 12' 46' <br /> Product Stored: Dyed Diesel Dyed Diesel Dyed Diesel Dyed Diesel <br /> Method and location of Test boot at Piping Test boot at Piping Test boot at Piping Test boot at Piping <br /> piping-run isolation: Sump Sump Sump Sump <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> ressure and starting test: <br /> Test Start Time: 9:25 9:30 9:35 9:40 <br /> Initial Reading(Ri): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 10:25 10:30 10:35 10:40 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour I Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />