My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_2006-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 12:42:29 PM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2018
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231736_1420 N TRACY_2006-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Pae of <br /> SEP 0 6 2019 <br /> 6. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer E,Industry Standard <br /> Other(Spec) <br /> Test Method Used: X Pressure El Vacuum E Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run 45 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Poly-Co Flex Plastic <br /> Piping Manufacturer: Western Fiberglass <br /> Piping Diameter: F, <br /> Length of Piping Run: 47' <br /> Product Stored: Dyed Diesel <br /> Method and location of Test boot at Piping <br /> piping-run isolation: Sump <br /> Wait time between applying 10 Minutes <br /> -pressure and st ing test: <br /> Test Start Time: 9:45 <br /> Initial Reading(Ri): 5 Psi <br /> Test End Time: 10:45 <br /> Final Reading(RF): 5 Psi <br /> Test Duration: 1 Hour <br /> Change in Reading(RF-RI): 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi <br /> Criteria: <br /> Test Result: Pass <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.