My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_2006-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 12:42:29 PM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2018
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231736_1420 N TRACY_2006-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> NI <br /> . 7 <br /> SWRCB,January 2002 SEP 0 6 2016 Page of <br /> 7. PIPING SUMP TESTING ms's <br /> Test Method Developed By: t Sump Manufacturer ❑Industry Standard 6jt jj'IR _ *Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> El Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# I Sump# Sump# Sump# <br /> Sump Diameter: 30" <br /> Sump Depth: 24" <br /> Sump Material: Coated Steel <br /> Height from Tank Top to Top of 13" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 13 ,/2„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' Water Line 17 3/a" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Suction System <br /> product and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe N/A <br /> shutdown?* <br /> Was fail-safe verified to be N/A <br /> operational?* <br /> Wait time between applying water 10 Minutes <br /> and starting test: <br /> Test Start Time: 9:55 <br /> Initial Reading(91): 001 <br /> Test End Time: 10:25 <br /> Final Reading(RF): .001 <br /> Test Duration: 30 Minutes <br /> Change in Reading(RF-RI): 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes <br /> Test Result: Pass <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and yes <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.