Laserfiche WebLink
SWRCB, January 2002 <br />8. <br />Test Method Developed By: <br />L <br />Page of <br />UNDER-DISPENSER CONTAINMENT UDC TESTING <br />❑ UDC Manufacturer ❑ Industry Standard C# Professional Engineer,_ <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />UDC # UDC # UDC # UDC # <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?` <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?* <br />Was fail-safe verified to be <br />operational?* <br />Wait time between applying <br />water and starting test <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />No UDC'S. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to aM of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160) <br />