My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_2006-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 12:42:29 PM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2018
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231736_1420 N TRACY_2006-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page of <br />7. PIPING SUMP TESTING <br />Test Method Developed By: <br />0 Sump Manufacturer 0 Industry Standard X Professional Engineer, <br />Li Other (Specify) <br />Test Method Used: <br />Ll Pressure [I Vacuum X Hydrostatic <br />[I Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />11000M <br />Sump # I <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />3099 <br />Sump Depth: <br />2491 <br />Sump Material: <br />Coated Steel <br />Height from Tank Top to Top of <br />Piping Penetration: <br />1399 <br />-Highest <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />13 V21' <br />Condition of sump prior to testing: <br />Dry <br />Portion of Sump Tested' <br />Water Line 171/4" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Suction System <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />N/A <br />Was fail-safe verified to be <br />operational?* <br />N/A <br />Wait time between applying water <br />and starting test: <br />10 Minutes <br />Test Start Time: <br />9:35 <br />Initial Reading (Ri): <br />.001 <br />Test End Time: <br />10:05 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF-RI): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Was sensor properly replaced and Yes <br />verified functional after testi <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to pLny of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.