Laserfiche WebLink
0 <br />SWRCB, January 2002 Page of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: X Pressure 1-1 Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: 0-15 PSI <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Test boot <br />Test boot <br />Test boot <br />Test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI). <br />Pass/Fail Threshold or <br />Criteria: <br />0 drop <br />0 drop <br />0 drop <br />0 drop <br />Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />