My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_2006-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 12:42:29 PM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2018
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231736_1420 N TRACY_2006-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;EDREC40 ' <br /> r-� � � <br /> NOV 2 1 ?O1R <br /> Overfill Protection Testing Testing Rocedure <br /> ENV\RONNIENTAL HEALTH <br /> �����TMiENT <br /> c. Print the Tank Inventory Report. <br /> d. Test the relay assigned to the external Overfill alarm (if present)to insure the Overfill alarm works. <br /> 1. If the Overfill alarm does not sound,repair the device before continuing testing. <br /> 3. Tooting <br /> a. Turn off power tothe console. <br /> 6. Disconnect the probe from the field wiring and remove bfrom the riser. <br /> 1. Ryou are testing more than one tank remove all the probes from their risers. <br /> c. Lay the probe safely onthe ground and reattach the field wiring. <br /> d. Position the water float atthe bottom ofthe probe and the product float 25qbupfrom the bottom ufthe <br /> probe. <br /> e. Power the console back on. <br /> t Simulate odelivery aafollows: <br /> 1. Move the float towards the top of the probe at a rate of 1-2"per ten seconds. <br /> D. Continue moving the float tothe top ofthe probe atarate of1'2"per ten seconds for the next 5U <br /> seconds,the probe ionow indelivery mode. <br /> 3. Slide the float at a moderate speed to the top of the probe. Note to not slam the float against the head <br /> ofthe probe,this can damage the float. <br /> g. Once the float reaches the overfill level the Overfill alarm,including external Overfill alarm (if present),will <br /> sound. <br /> h. Silence the Overfill alarm onthe TLS and external Overfill alarm(if present) byacknowledging it. <br /> i Move the float down to the bottom of the probe.The TLS will clear the Overfill alarm once the delivery delay <br /> time iacomplete. <br /> j. Repeat 3f'3ifor the other probes. <br /> 4. Test Completion <br /> a. Print out the delivery report for all tanks tested. <br /> b. Power off the console. <br /> o, Replace theprobes back into the tank;before inserting into riser,ensure that the floats are positioned u1the <br /> bottom ofthe probe. <br /> d. Power onthe console. <br /> e. If the console is running BIR enter a manual adjustment for the amount of the delivery. <br /> f. If the site is not running BIR give the delivery report to the store manager so they can log the delivery as <br /> part ofthe overfill testing. <br /> ' 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.