Laserfiche WebLink
Fr�Win F-4.tfp6- �Ap&r Sexi-es 0 <br /> Maintenance Inspecting/Verifying 95% Level (Without <br /> The 708-590 Series Overfill Prevention Valve has no Removing from Tank) <br /> periodic maintenance requirements. FOR DIMENSIONS "A"&"B": Refer to the"installation <br /> However, if the drop tube and valve assembly is removed record sheet"or re-measure and re-calculate per figure 1. <br /> from the tank(for inspection or service), inspect the <br /> drop tube seal for wear/damage(Figure 16). Replace if 1. Measure Dimension 7" (Figure 18) <br /> necessary. 971 (Upper drop tube flange to -44— <br /> edge of upper tube adapter) <br /> 2. Verify using the calculation below <br /> (Drop tube seal surface to <br /> 66 A 19 bottom of tank) <br /> (Subtract) <br /> Drop Tube Gasket Instal "B" (95%Volume from tank chart) <br /> orientation) I I <br /> (Subtract) <br /> Figure 16:Inspect Gasket [4.5" (114mm) (95%Shutoff level offset) <br /> Additionally, if the upper or lower drop tube is (Equals) <br /> unthreaded/removed from the OPV,the O-ring(s)should <br /> be replaced (Figure 17). Same value as 'T' <br /> indicates correct installation <br /> Inspect O-ring <br /> Measure <br /> ............ <br /> 41/211 <br /> (114 mm) <br /> Inspect O-ring if <br /> Figure 17.,Inpect O-Rings Figure 18:Dimension Verification After Installation <br /> 9 <br />