Laserfiche WebLink
\/Q <br /> Scope <br /> This procedure will provide a Veeder-Root ATG certified technician a procedure to safely test tank overfill <br /> protection. <br /> Reference Documents <br /> ° VeederRoutTL8-3X%Operators Manual (5?GD13'G10) <br /> ° VeoderRuotTLS'UXXSetup Manual (578013'623) <br /> " Vae6erRnn8TL8'45OSetup and Operation Screens Manual (577O13'Q4D) <br /> ° V*ederRootTLS'45OPLUS/TLB4Operator's Manual (577814'11O) <br /> ^ VeedorRootTLS4Quick Start (577014'034) <br /> ° VeederRontOverfill Alarm Installation Guide(578O13-58A) <br /> Consoles <br /> TLB'45OPLUO.TL84c.TLS4i.TUB'45Oand TLB3XX <br /> Requirements <br /> TLS-450PLUS,TLS4c,TLS4i,TLS-450:Automatic Event:Device Task programmed to trigger on Tank Overfill and <br /> close erelay feeding voltage tothe Overfill alarm device. <br /> TLS-3XX:Output relay programmed to close a relay on a Tank Overfill alarm feeding voltage to the Overfill alarm <br /> device. <br /> Testing Procedure <br /> 1. Inspection <br /> s. Verify the levels in the tank to make sure there is product in the tank and that the tank is enabled. <br /> b. Kthe site iscurrently receiving adelivery,wait until the delivery is complete. <br /> c. |fthe tank ieperforming oSLID tank test,stop the test. <br /> 2. Pnopaodkun <br /> e. Turn Alarm filtering off,as this will allow you to clear alarms quicker. Refer to TLS-3XX Setup manual <br /> (578U13'G23) orTLS4X%on-line help. <br /> b. Program Delivery delay to 1 minute,this will allow the delivery to be completed quicker. <br /> 1. Note the customers original value,ooyou can restore dafter the test. <br /> 24 <br />