Laserfiche WebLink
If J <br /> SAFET'S' <br /> Inhalation Hazards <br /> Skin Absorption Hazards <br /> 9.2.2 PHYSICAL HAZARDS <br /> Noise <br /> Heat Stress <br /> Open Excavation <br /> Heavy Equipment <br /> Confined Space <br /> Slip, trip and fall hazards <br /> Electrical Hazards <br /> 9.3 HAZARD CONTROL MEASURES <br /> 9.3.1 PERSONAL PROTECTIVE EQUIPMENT <br /> * Follow instructions in the HASP <br /> 9.3.2 BARRIERS AND SIGNS <br /> Barriers and signs shall be installed around the open excavation. Signs shall state "NO <br /> SMOKING." <br /> FIRE and/or EXPLOSION PREVENTION <br /> Due to the presence of flammable materials and substances on the site, <br /> proper housekeeping practices will be followed. These include storing debris <br /> in a designated location for removal,job-site cleanup at the end of each day, <br /> and storage of hazardous materials according to Tait's existing practices and <br /> procedures. <br /> Tait shall have the appropriate fire extinguisher equipment on the job prior to the start <br /> of the project. No cutting torch, open flame, or spark producing equipment shall be <br /> used on the tank or piping at any time. Any source of ignition shall be at least 50 feet <br /> away from the excavation site. <br /> 11/07/2005 revision 5 16 <br />