My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A properly calibrated flammable/combustible gas and oxygen analyzer is required on <br /> the job site prior to excavation or removal. Calibration of the meter must be within the <br /> last three months. <br /> All electrical lines, piping, and like items known to be associated with the tank shall be <br /> isolated or disconnected. <br /> If at anytime during the excavation, the lower explosive limit of the atmosphere around <br /> the tank exceeds 25 percent, all work will cease and proper mitigation procedures <br /> initiated. <br /> 9.3.4 CONFINED SPACE <br /> DO NOT ENTER TANK SUMP (S) FOR ANY REASON. Appropriate control <br /> measures, such as fencing and confined space supervision, must be <br /> employed prior to any worker entering into the tanks sumps. <br /> All tank sumps are considered permit required confined spaces until they are <br /> removed, and after the new sumps are installed and the concrete tank slab <br /> has been poured. Monitoring and all other confined space procedures must <br /> be followed when entering the sumps. THERE ARE NO EXCEPTIONS <br /> 10.0 SOIL REMOVAL, DISPOSAL AND SAMPLING <br /> Any and all soil removal and disposal is the sole responsibility of the client, and all soil samples <br /> will be analyzed per clients' requirements. <br /> 11. Lock-out / Tag-out procedures (Energy Isolation) <br /> Lock-out procedures must be followed during the cleaning, servicing, or adjusting of <br /> machinery or electrical equipment. LOTO procedures shall be implemented as required <br /> by applicable Federal, State, or Property Owner rules and regulations. <br /> 12. FALL PREVENTION <br /> 100% fall protection shall be employed for all work at heights. Fall protection shall <br /> include scaffolds, aerial lifts, and personnel hoists. Also guardrails, toe boards, and other <br /> primary systems may be implemented. In addition, provisions for secondary fall protection <br /> (full-body harness and fall arrest systems) shall be used for employees working or traveling <br /> more than six (6) feet above a lower level and are exposed to an imminent fall hazard (this <br /> includes working conditions hat present hazards such as leading edge, open holes, and <br /> skylights on building rooftops and/or other elevated towers/structures). All fall protection <br /> devices used shall be manufactured in accordance with an acceptable recognized standard <br /> 11/07/2005 revision 5 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.