My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 2 of 4 <br /> 4.TANK ANNULAR TESTING <br /> Test Method Developed by ❑Tank Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used ❑Pressure ® Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:4 INCH DIAL GAUGE Equipment Resolution:0.2 <br /> Tank# Tank# Tank# Tank# <br /> #CAK482U001 <br /> Is Tank Exempt From Testing?(1) ❑ Yes ® No ❑ Yes ❑No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Tank Capacity: 15,000 GALLONS <br /> Tank Material: FIBER-STEEL <br /> Tank Manufacturer: MODERN <br /> Product Stored: RED DIESEL <br /> Wait Time between applying 15 MINUTES <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 9:30 AM <br /> Initial Reading(Ri): -10 IN HG <br /> Test End Time: 10:30 AM <br /> Final Reading(Rf): -10 IN HG <br /> Test Duration: 1 HOUR <br /> Change in Reading(Rf-Ri): 0 IN HG <br /> Pass/Fail Threshold or Criteria: 0 IN HG <br /> Test Result ® Pass ❑ Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Was Sensor Removed for Testing? ® yes ❑No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was Sensor properly replaced and ®Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> verified after testing? IL_ III 1 11 <br /> Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br /> ANNULAR#CAK482U001 PASSED THE REQUIRED VACUUM TEST.NO REPAIRS ARE NEEDED AT THE PRESENT <br /> TIME. <br /> (1)Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as <br /> sysrtems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of <br /> Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.