My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 of 4 <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed by ❑Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used ®Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:4 INCH DIAL GAUGE Equipment Resolution:0.2 <br /> Piping Run#Supply Piping Run#Return Piping Run# Piping Run# <br /> #CAK482U001 #CAK482U001 <br /> Piping Material: FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: AMERON AMERON <br /> Piping Diameter: 3 INCHES 3 1NCHES <br /> Length of Piping Run: APPROX. 150 FEET APPROX. 150 FEET <br /> Product Stored: RED DIESEL RED DIESEL <br /> Method and location of piping-run TEST BOOT TEST BOOT <br /> isolation: <br /> Wait Time between applying 15 MINUTES 15 MINUTES <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 9:00 AM 9:00 AM <br /> Initial Reading(Ri): 5 PSI 5 PSI <br /> Test End Time: 10:00 AM 10:00 AM <br /> Final Reading(Rf): 5 PSI 5 PSI <br /> Test Duration: 1 HOUR 1 HOUR <br /> Change in Reading(Rf-Ri): 0 PSI 0 PSI <br /> Pass/Fail Threshold or Criteria: 0 PSI 0 PSI <br /> Test Result N Pass ❑ K!!LJ1 ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br /> SUPPLY AND RETURN SECONDARY PIPING#CAK482U001 PASSED THE REQUIRED PRESSURE TEST.NO REPAIRS <br /> ARE NEEDED AT THE PRESENT TIME. <br />
The URL can be used to link to this page
Your browser does not support the video tag.