My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 4 of 4 <br /> 6.PIPING SUMP TESTING <br /> Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:INCON TS-STS UNIT Equipment Resolution:0.006 <br /> Sump#Supply Sump#Return Sump# Sump# <br /> #CAK482U001 #CAK482U001 <br /> Sump Diameter 54 INCHES 54 INCHES <br /> Sump Depth 41.5 INCHES 41.4 INCHES <br /> Sump Material FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 12 INCHES 16 INCHES <br /> Highest Piping Penetration <br /> Height from Tank Top to Lowest 30 INCHES 26 INCHES <br /> Electrical Penetration <br /> Condition of sump prior to testing GOOD GOOD <br /> Portion of Sump Tested(1) 2"ABOVE PIPING 2"ABOVE PIPING <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑ Yes ❑ No U NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> product and water)?* <br /> Turbine shutdown response time NA NA <br /> Is sytem programmed for fail-safe ❑ Yes ❑ No ® NA ❑ Yes ❑ No RNA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑ Yes ❑ No N NA ❑ Yes ❑ No U NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 MINUTES 15 MINUTES <br /> test <br /> Test Start Time 11:53 AM 12:11 PM 1:23 PM 1:45 PM <br /> Initial Reading i 4.2733 4.2734 5.6597 5.2493 <br /> Test End Time 12:08 PM 12:26 PM 1:38 PM 2:00 PM <br /> Final Reading R 4.2732 4.2734 5.6597 5.2493 <br /> Test Duration 15 MIN. 15 MIN. 15 MIN. 15 MIN. <br /> Change in Reading Rf-Ri -0.0001 0.0000 0.0000 0.0000 <br /> Pass/Fail Threshold or Criteria 0.002 0.002 <br /> Test Result ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was sensor properly replaced and ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> verified functional after testin ? <br /> Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br /> SUPPLY AND RETURN SUMPS#CAK482U001 PASSED THE REQUIRED HYDROSTATIC TESTS.NO REPAIRS ARE <br /> NEEDED AT THE PRESENT TIME. <br /> (1)If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.