Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: <br />Check this box if tank gauging is used only for inventory control. <br />FCheck this box if no tank gauging or SIR equipment is installed. <br />This secti on must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />)mplete the following checklist: <br />Yes <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />F No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />No* <br />Was accuracy of system product level readings tested? <br />_. <br />Yes <br />_ <br />No* <br />___..,.... .. ,__ _. ___._ ,.»..... _».___ _._ _. __._..., . _ ..._._......_,._,.,.._,_ ......__ <br />Was accuracy of system water level readings tested? <br />Yes <br />F No* <br />Were all probes reinstalled properly? <br />Yes <br />F No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />, <br />*In the Sectiones below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): F Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes <br />F No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?(Check <br />F N/A <br />all that apply) Simulated leak rate: F 3 gp.h.; F 0.1 g.p.h ; F 0.2 g.p.h. <br />F Yes <br />F No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />F Yes <br />F No* <br />Was the testing apparatus properly calibrated? <br />F Yes <br />F No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />r— Yes <br />F No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />F N/A <br />r Yes <br />F No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />N/A <br />disconnected? <br />r Yes <br />F No* <br />m __»m �. . <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions .......or <br />F N/A <br />fails a test? <br />r Yes <br />F No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />F N/A <br />r Yes <br />F No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Suction System. <br />