My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:30:52 PM
Creation date
6/23/2020 6:51:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ifthe entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />S WRCB, January 2002 <br />Page of _ <br />7. UNDER -DISPENSER CONTARIMENT MCI <br />TESTING <br />Test Method Developed By: <br />❑ UDC Manufacturer �ndustry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />j<Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />UDC # 14a <br />UDC # 34 <br />UDC # UDC # <br />UDC Manufacturer; <br />UX AC. <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />" <br />' <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />C( `' <br />'" 21 <br />Condition of UDC prior to <br />testing: <br />, <br />Portion of UDC Tested <br />2- ., <br />2 -A 6.-.c ,. +' <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes❑ A <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA :���NoO <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown? <br />p Yes ❑ No ❑ NA <br />No ❑ NA <br />No ❑ NA ❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />o erational?` <br />11❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA o ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />.starting test <br />., <br />Test Start Time: <br />! <br />jnoj. <br />Initial Reading <br />�2 <br />Test End Time: <br />0 <br />Final Reading (RF): <br />-7 <br />1 b <br />Test Duration <br />Chan a in Readin F -RI): <br />Pass/Fail Threshold or Criteria: <br />r- <br />Was sensor removed for testing? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testis ? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />,COMMentS — (include information on repairs made prior to testing and recommended follow-up for failed tests <br />1 ifthe entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.