Laserfiche WebLink
1 ifthe entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />S WRCB, January 2002 <br />Page of _ <br />7. UNDER -DISPENSER CONTARIMENT MCI <br />TESTING <br />Test Method Developed By: <br />❑ UDC Manufacturer �ndustry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />j<Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />UDC # 14a <br />UDC # 34 <br />UDC # UDC # <br />UDC Manufacturer; <br />UX AC. <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />" <br />' <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />C( `' <br />'" 21 <br />Condition of UDC prior to <br />testing: <br />, <br />Portion of UDC Tested <br />2- ., <br />2 -A 6.-.c ,. +' <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes❑ A <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA :���NoO <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown? <br />p Yes ❑ No ❑ NA <br />No ❑ NA <br />No ❑ NA ❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />o erational?` <br />11❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA o ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />.starting test <br />., <br />Test Start Time: <br />! <br />jnoj. <br />Initial Reading <br />�2 <br />Test End Time: <br />0 <br />Final Reading (RF): <br />-7 <br />1 b <br />Test Duration <br />Chan a in Readin F -RI): <br />Pass/Fail Threshold or Criteria: <br />r- <br />Was sensor removed for testing? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testis ? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />,COMMentS — (include information on repairs made prior to testing and recommended follow-up for failed tests <br />1 ifthe entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />