Laserfiche WebLink
SWRCB, January 2002 <br />Page of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer 4dustry <br />❑ Other (Spec) <br />Standard ❑ Professional Engineer . <br />Test Method Used: <br />essure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:�)-Sf <br />Piping Material: <br />PIping Run #Piping Run # <br />, r5Ap <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Manufacturer: <br />h - : S e ' <br />rl <br />Piping Diameter: <br />Length of Piping Run: <br />315 + <br />, <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: <br />, ` O <br />Initial Reading (R,): <br />"" <br />Test End Time: <br />y <br />Final Reading (RF): <br />2 <br />Test Duration: <br />Change in Reading (RF -R4): <br />Pass/Fail Threshold or <br />Criteria: <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />I <br />