Laserfiche WebLink
TANK # <br /># I # 2. _ <br /># 2 <br />UST <br />SYSTEM DRAWING INFORMATION <br />CAPACITY <br />10 000 10 c400 <br />10000 <br />1. <br />_ (1) <br />Three complete sets of plans (include manufacturer's specification sheets for p installed). <br />2. <br />/ <br />Plans drawn to scale in non -erasable print. <br />0 <br />3. <br />/ <br />Plot plan to show location of tanks and all associated piping. NOV 2 4 1997 <br />4. <br />/ <br />Striker plates or drop tube -mounted bottom protectors illustrated below V g 1 T <br />5. <br />/ <br />Tank cross-sectional diagram. PERMIT/SERVICES <br />6. <br />/ <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />- ! <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />_ C. <br />CORROSION PROTECTION <br />Article 3, Section 2631 (b) & 26353 <br />8. <br />- ` <br />Verification of product compatibility with the tank(s), piping, monitoring <br />U.L. LISTED <br />device(s), epoxy or silicone glues, etc. <br />9. <br />' <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />< <br />At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br />_ (3) <br />secondary (20) contairynent systems before covering. [Section 2635 (a) (3) & (4)) <br />11. <br />! <br />Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)I <br />17 <br />TAur rfwDm TTTnu <br />TANK # <br /># I # 2. _ <br /># 2 <br /># <br /># <br />CAPACITY <br />10 000 10 c400 <br />10000 <br />_ (1) <br />MANUFACTURER <br />G'}Cleff-1NC� Tei �/1 <br />N <br />Vacuum applied to interstitial space. <br />Ze. <br />COMPOSITION <br />, <br />MODEL <br />(1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />_ (2) <br />PRODUCT <br />_ (3) <br />Hydrostatic annular (primary tank pressure test). <br />_ C. <br />CORROSION PROTECTION <br />tank [Section 2635 (a) (2) (A)I <br />_ (1) <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />U.L. LISTED <br />etc.). <br />_ (2) <br />COMPATIBILITY WITH 100% <br />METHANOL <br />Y�5 <br />corrosion specialist. <br />13. TANK(s) TO BE <br />INSTALLED <br />A. <br />Steel -clad with <br />fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />_ (1) <br />Tested at the installation site using an electric resistance holiday detector. <br />_ (2) <br />Vacuum applied to interstitial space. <br />Ze. <br />Fiberglass <br />(iSTift�j ) <br />(1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ (3) <br />Hydrostatic annular (primary tank pressure test). <br />_ C. <br />Non -clad steel <br />tank [Section 2635 (a) (2) (A)I <br />_ (1) <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) <br />Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />_ (3) <br />Impressed current systems to be inspected no less than every 60 days. <br />5 <br />