Laserfiche WebLink
All Be staff working on site have completed training in hazard recognition and basic health and safety <br />issues as required by the occupational safety and health regulation contained in 29 CFR 1910.120 (e). <br />In addition, each employee will be familiar with the requirements of the SSHP, and will participate in <br />site activity and safety briefings, there will be an initial site safety meeting and preconstruction meeting <br />held prior to the start of field work to thoroughly brief all project staff on the work plan, health and <br />safety procedures, and conduct a site walk through. <br />The contractor that installs the soil vapor probes, vapor monitoring wells, and piping will not be required <br />to have 40 -hour health and safety training. Their involvement in this phase of work should not expose <br />them to any hazardous substance that could cause a health effect, or require the need for this level of <br />training. However, field personnel will participate in an initial site activity and safety briefing which will <br />include the applicable section of this SSHP. <br />F941W# , • • <br />Based on the hazard analysis for this project, the following personal protective equipment (PPE) will be <br />required and used. Changes to these specified items PPE will not be made without the approval of the <br />site safety officer. <br />Tank Removal/Excavation <br />The PPE for this project will be Level D. Steel -toed boots, hard hats,a nd safety glasses will be worn in <br />the work area. Cotton overalls may be worn for dirt protection. Ear plugs will be available. <br />These items do not provide any chemical protection. Nitrile gloves with latex or vinyl liners should be <br />worn when sampling or handling contaminated soils to prevent skin contact with contaminants. If <br />conditions are encountered where any of the constituents listed in Table C-1 are detected at or above the <br />TLV for that chemical, work will cease. Level C PPE will be donned prior to continuing work at the site <br />under such conditions. Level C will include Saranex coveralls, nitrile gloves with liners, and fullface air - <br />purifying respirators with organic vapor cartridges in addition to the level D items specified above. <br />Soil Vapor Extraction System <br />The PPE required will be level D, which consists for work clothes and safety boots. <br />The potential hazards identified in the hazard analysis portion of this plan determined the need for initial <br />and/or ongoing monitoring for assessment of exposure to the hazards as follows. <br />Tank Removal/Excavation <br />Monitoring for flammable concentrations of gases and vapors will be conducted continuously using a <br />combustible gas indicator at the excavator location while any underground work occurs at the site. In <br />addition, for the first two days of field work, monitoring will be conducted using a Century OVA 24 <br />hours a day to assess potential methane gas contamination to migrate off-site. The OVA will be calibrated <br />for methane. Time, location, and concentration will be recorded for each reading. The combustible has <br />