Laserfiche WebLink
SOARO OF TRUSTEES <br />James Culbertson. Pres. <br />Patricia E. Vannuccl, Sec'y <br />Anthonetto Van Spronsen <br />Earl Pimentel <br />Fern Bu®bee <br />Daniel L. Flores <br />John O. Most. M.O. <br />William J. Wade <br />Mary Anna Love <br />Facility Name <br />Address <br />SAN JOAQUIN LOCAL HEALTH DISTRICT <br />1601 East Hazelton Avenue, P. O. Box 2049 <br />Stockton, California 95201 <br />209/466-6781 <br />Jo®I Khanna. M.O., M.P.H., District Health Officer <br />11_1Ayr <br />/a -.A . ✓1 _ c—_ 'r ,e <br />Date of Inspection Inspector <br />SERVING <br />City of Lodl <br />San Joaquin County <br />City of Escelon <br />City of Manteca <br />City of Ripon <br />City of Stockton <br />City of Tracy <br />San Joaquin County <br />San Joaquin County <br />MONITORING ALTERNATIVE ##7 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liquid level in the tank can be measured to -an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />_Tank gauging performed as follows: <br />__ZTank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />v1 Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />1.: Precision test(s) must be performed by _�? - - and results submitted to this <br />office within 30 days of the test. <br />2.: Tank gauging must be started immediately. (See instructions above), <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4 186 <br />