My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:54:13 PM
Creation date
6/23/2020 6:52:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E,C <br /> PLLD Transducer Ins%M tion - <br /> FE Petro Pumps ENVIRONMENTAL HE•AI TH <br /> '-)FPARTMENT- <br /> 1. Switch Off,tag,and lockout all AC power to the TLS console,dispensers and submersible pumps. <br /> 2. If a ball valve is installed down line from the pump,close ft. <br /> 3. If the pump does not have a Stage II vapor recovery device installed in the pressurized piping,remove the 2" <br /> NPT plug from line leak detector port. <br /> Install the PLLD transducer into the 2"NPT port as shown in Figure 12. <br /> IMPORTANT!Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel In- <br /> volved. <br /> 4. If the pump does have a Stage 11 vapor recovery device installed in the pressurized piping,lubricate the <br /> external o-ring on the SwiftCheck valve using mineral oil or other suitable lubricant and thread the valve into <br /> the Red Jacket leak detector fitting(PfN 038-072)as shown in Figure 5 on page 11 instead of in the pump's <br /> leak detector port.Next thread the PLLD transducer into the SwiftCheck valve. <br /> IMPORTANT!Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel in- <br /> J&1 volved. <br /> Because the PLLD transducer must be installed downstream from these devices,a monitored containment <br /> sump is required. <br /> There must not be a check valve installed between the SwiftCheck valve and the pump for PLLD to function <br /> properly. <br /> Ensure that the Healy pump is wired according to the manufacturer's instructions and utilizes isolation relays. <br /> 5. For PLLD operation there must be a FE Petro model R precision check valve in the pump,If necessary,replace <br /> the current check valve with a model R precision check valve (ref.Figure 12). <br /> Pressure Test Port-remove plug to access <br /> ,, <br /> valve clamp adjustment screw.Turn screw <br /> CCW until valve damp is all the way up and <br /> ® <br /> Manifold snug against manifold cover. <br /> �J <br /> cover <br /> valve clamp FE Petro O-ring <br /> (should be snug ' /� Part No.400211238 or 400333238 <br /> up against cover) I/"'*"\•I�' <br /> (``,�•,� I PLLD transducer <br /> � I <br /> Check valve <br /> spring <br /> Model R ( ! <br /> Precision \� <br /> check valve i j I 46 <br /> �o <br /> PU."VWIPAM <br /> I <br /> Figura 12 Locatlon of PLLD transducer and model R precision check valve in FE Petro pump <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.