My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:54:13 PM
Creation date
6/23/2020 6:52:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HECEIVEL <br />I - qFC11)1LY1'A r9TVQT-&74-- 14 <br />Test Method Developed By: ElPiping Manufacturer 2 Industry Stan F1 NVft NMTA <br />Other (Specify) 6,Ir- , �9_, <br />Test Method Used: Pressure 0 Vacuum El Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: See attached testing procedures <br />Equipment Resolution: <br />Piping Material: <br />Piping Run # 87 <br />Piping Run # 91 <br />Piping Run # <br />Piping Run # <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />399 <br />399 <br />Length of Piping Run: <br />Approx 150' <br />Approx 150' <br />Product Stored: <br />Gas 87 <br />Gas 91 <br />Method and location of <br />isolation: <br />piping -run isolation: <br />Test boot in sump <br />Test boot in sump <br />Test boot in sump <br />Test boot in sump <br />Wait time between applying <br />pressure/vacuum/water <br />starting test: <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />10:14am <br />10:14am <br />Initial Reading (RI): <br />5 psi <br />5 psi <br />Test End Time: <br />11:14am <br />11:14am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />Test Duration: <br />1 hour <br />1 hour <br />I hour <br />1 hour <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Test Result: <br />Z Pass El Fail <br />0 Pass El Fail <br />El Pass 0 Fail <br />El Pass El Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />6 month post repair compliance testing conducted as per San Joaquin County Permit SR0069 769 <br />
The URL can be used to link to this page
Your browser does not support the video tag.