Laserfiche WebLink
CJ <br />P711 M".1* a <br />n <br />Emergency Stop (E -Stop / ESO) Periodic Inspection <br />., /wNg <br />p- <br />Site #: CHEVRON # 96171 (N-621-1-3) 96171 <br />Date: 1/30/2014 <br />Address: 6633 PACIFIC AVE <br />Name: Jarrod Cooke <br />City / State: STOCKTON CAS <br />Technician Signature: <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits <br />(turbines, and <br />dispensers) are de -energized, and remain de -energized until they are re -set manually). The test procedures and guidelines shall be in accordance <br />with the E -Stop Testing Process. <br />,_ M11`7 <br />JS <br />Number of E -Stop switches INSIDE of the building: <br />1 <br />1 <br />2 <br />Number of E -Stop switches OUTSIDE of the building: <br />3 <br />MM g '� y3 <br />!M <br />-3�i, <br />r i 3 3 <br />�1,�!�/u',.�, Y�."2y\ <br />=�J9. <br />You have added or confirmed that all E -Stop locations are on the Site Diagram <br />r <br />r <br />.. 3i <br />r <br />3 <br />4 <br />Do all E -Stops shutdown power to ALL DISPENSERS <br />r* <br />M <br />r <br />5 <br />Do all E -Stops shutdown power to ALL STP's <br />6 <br />Are ALL E -Stops clearly Labeled <br />' o <br />7 <br />Are the TURBINE BREAKERS clearly identified / labeled <br />r <br />r <br />/ <br />1M-13 <br />'�; /3 / /�2-0 <br />'/�N <br />" <br />! 313�"�.>3�q,(/ <br />b i; i. >s / 3•. �:'�ri�/t `S.F"�+§ <br />8 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />f"+ <br />r <br />r <br />9 <br />All safety barricades and test equipment has been properly removed <br />4 <br />r <br />r <br />10 <br />E -Stop was reset and all dispensing functions are normal <br />to <br />r <br />f"" <br />E -Stop Inspection Results <br />11 <br />PASS I FAIL ( INCONCLUSIVE <br />MMM WN <br />M <br />WO: 2314881 <br />