Laserfiche WebLink
0 0 <br />Chevron Monitoring Certification Checklist <br />Store Number: 96171 <br />Address: 6633 PACIFIC AVE STOCKTON, CA 95207 <br />Date: 1/30/2014 <br />Technician: Jarrod Cooke <br />Company: TANKNOLOGY INC. <br />Has the Veeder Root Battery been replaced prior to failsafe? <br />Tank 1- SUPREM <br />Tank 2 - REGULA <br />Tank 3 - REGULA <br />y <br />Product <br />1 <br />2 <br />3 <br />y <br />Tank Type <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />(DW FRP, DW Steel, SW FRP) <br />N <br />(Ciro Tek 300MB-10 or 400MB-10 or PetroClear 40510-A only) <br />Tank Diameter <br />91.00 <br />91.00 <br />91.00 <br />Annular Riser Height (measured) <br />46.00 <br />49.00 <br />50.00 <br />Required (calculated) annular sensor length <br />FRP tanks - see Note 1 below <br />142.87 <br />142.87 <br />142.87 <br />Steel tanks - see Note 2 <br />is req'd annular sensor length marked with tape & <br />labeled with dimension <br />N <br />N <br />N <br />(Y/N, document w/ photo)? <br />Actual (measured) annular sensor length <br />160.00 <br />160.00 <br />160.00 <br />(to marked point) <br />Are the DW pipe boots pulled back in tank sumps? <br />(YIN or N/A, note if can't be verified because clamshell is <br />Y <br />Y <br />Y <br />pointing down) <br />Are tank sump sensors back in their holders and in the <br />correct position? Y Y Y <br />(YIN or N/A document with photo) <br />(Y/N) Comments <br />Has the Veeder Root Battery been replaced prior to failsafe? <br />Y <br />Has Veeder Root Programming before & after testing been verified? <br />y <br />(especially tank manifolding setup - see Note 3) <br />Has Veeder Root Programming before & after testing been attached to the <br />y <br />Work Order? <br />Are gasoline spin on -filters replaced during testing for ethanol per <br />Chevron requirements <br />N <br />(Ciro Tek 300MB-10 or 400MB-10 or PetroClear 40510-A only) <br />Have all alarms generated during testing been noted in the station Alarm <br />y <br />Log? (YIN) <br />Additional Comments: <br />Note 1: <br />DW FRP Tank Annular Calculations <br />(circumference) <br />X = ( 3.14 x tank diam/2 ) + riser height <br />10'diameter X=188"+riser <br />8'diometer X=151"+riser <br />6'diameter X=113"+riser <br />Note 2: DW Steel Tank Annular Calculation <br />X = tank diameter + Riser Height <br />Note 3: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings anytime the programming is changed, such as when <br />sensors are temporarily Ved out, etc. <br />