Laserfiche WebLink
SWRCB, January 2002 Page of <br /> b. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer I Industry Standard TPssional l ineer <br /> Other(.'peci&) <br /> "Test Method Used: � ' Pressure i Vacuum _ 1lydrostatic <br /> Other(Specft) <br /> fest Equipment Used: ( - ;��. „ • A f et t Equipment Resolution 0 M <br /> Sump# Sump# -z Sump# Sump# <br /> Sump Diameter: �NeK V" Oe-X t -7'tUe)ea Y7" <br /> Sump Depth: P-- -- �® �`< - 5 ,r 57 °(4 <br /> Sump Material: <br /> Height from Tank Top to Top ofHighest Piping Penetration: Zoe, I? _ <br /> Ileight from Tank Top to Lowest t <br /> Electrical Penetration: 2qlr <br /> Condition of sump prior to testing: - D1 1 � ` <br /> Portion of Sump Tested' t.�e.t� <br /> ` `t �j� � t 13" W efef ra�'1�c� C� 6" 141 e` Gg Vt L2-y" t c+ f 2-57 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes C;No (J NA �t'Ves ❑No i-]NA es I-No U NA (Yes <br /> ❑No is NA <br /> product and water)?. /� <br /> Turbine shutdown response time 1,j0 e14 c lf�: _ � f° r �r�� �<:� " "c tto j P-404 <br /> Is system programmed for fail-safe /es H No 1.1 NA �r'`1 es I_i No I !NA Yes I J No ❑NA es i]No i INA <br /> shutdown?* x <br /> Was fail-safe verified to be a <br /> C] Yes Flo NA Cl Yes o C'NA [_)Yes�iNo C.:NA C3 Yes No []NA <br /> -operational?* <br /> Wait time between applying <br /> — <br /> �_ <br /> pressure/vacuum("ter�Ad starting <br /> test: °''� ' °e $ '�, t" � ' �twt '° * I� r <br /> �. _ _ <br /> "Test Start Time:— ------- `._:-5.0- <br /> initial Reading(Ri): ;�� 0 ,.-I c �-S-tC nke T-_ vv "`F°" c.i r .t.0 <br /> Test End Time: �); .�! �d .'� l t e �� !Ba e� i <br /> Final Reading(RO: c"_(.- c.t f'-'r � � �� � "A; <br /> 'fest Duration: 30 3 ( r ll3> <br /> Change in Reading(RE-RI): et ��ckv-, c., ?0 ee�f Awl�-�g�-:� -- <br /> Pass/Fail threshold or Criteria: fa t U� !`1 , voS /<!rk e 3' d ` <br /> Test Result: Pass ❑ Fail Pass Q Fail Pass 0 Fail ass 0 Fail <br /> Was sensor removed for testing'? yyes No ( I NA iolyes �:No i NAe No NA r� es t.;No NA <br /> Was sensor properly replaced and <br /> verified functional atter testin�'? Yes i' No � NA c No NA V s No NA "res No NA <br /> (7omments- (include information on repai smadcprior to festirlj, (if It/rccunamen�Ied <Woic tit)firr f riled tests) <br /> tf the cutin., depth ofthe sump is not tested, *pecify how much was tested. If the answer to a-ny of the questions indicated with ;in <br /> asterisk(*) is"NU"or"NA", the entire sump must be tested. (See SWRCB LG- <br />