Laserfiche WebLink
SWRCB,January 2002 Page 5 of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: U UDC Manufacturer 0 Industry Standard rofessional Engineer <br /> f-I Other(Specify) xv <br /> Test Method Used: C I Pressure 11 Vacuum )(Hydrostatic <br /> U,Other(Speck)) <br /> Test Equipment Used: (4, I Iry J2= <br /> /,,a vJ Equipment Resolution: <br /> UDC Z2-- UDC -3 f UDC 5-g UDC# 7 s <br /> UDC Manufacturer: 6/1 M V_ yffo I/ <br /> UDC Material: r7_ <br /> -7 r <br /> UDC Depth: 0 <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: yt <br /> Condition of UDC prior to <br /> testing: 7 <br /> Portion of UDC Tested1-0,,I/er <br /> vj,?4 Wlet"e L rz <br /> Does turbine shut down when <br /> UDC sensor detects liquid(bothes 1]No 11 NA A-Yes 0No CNA Yes 0 No 11 NA UY U-1 es 11 No NA <br /> J� <br /> product and water)?` KY <br /> Turbine shutdown response time pul rl <br /> A­1-rV, ( go"k, tr 1"'A <br /> Is system programmed for fail- - I es IJ No El NAAL IS FJ No I]NA >Yes Cl No L1 NA es 0 No 0 NA <br /> safe shutdown?* Z�� <br /> Was fail-safe verified to be 11 Yes 'No 1-1 NA 0 Yes"P'Ro 10 NA 0Yes /No CNA F-1 Yes VAqo FJ NA <br /> op rational?* <br /> Wait time between l ppiap 1,v in g <br /> j- <br /> pressure/vacuo o water d <br /> starting test A) <br /> Test Start'rime: t d 1_9 05- 1,Q:YO <br /> Initial Reading(R-1): ,4' rer t,l 1--t-,54- <br /> Test End Time: 2 L4 o 12- �15 /" /o 3 0 <br /> Final Reading(110: -$-4 (-,�e,(p e-C Le r"-5 ("'e- 6- b" r-__ <br /> Test Duration: 3&1"® 4 -e5 3 6 P f s,stv! e,5 <br /> Change in Reading(RF-R,): A/0 r? <br /> Pass/Fail Threshold or Criteria: am0­" 104 f-/2,5_t`rf ell <br /> Test Result: fiT Pass El Fail Pass El Fail_ ass FJ Fail XPass 0 Fail <br /> No CNA <br /> No CNA es <br /> Yes ti'es G, ;KY1-1 <br /> Was sensor removed for testing? s 1 J No 0 LJ NA <br /> Was sensor properly replaced and No 1 <br /> No NA[] ;1��s C.1 JNA �� 1-1 11 NA )fYes 0No Cl NA <br /> verified functional after testing?? 'es !]No <br /> Comments— (include information on repairs made prior to testing, and recommendedfollow-upfor failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire UDC must be tested. (See SWRCBI.G-l60) <br />